A trough-type safe strawberry seedling raising method with adjustable water level
A technology of ground trough and water level, applied in the field of cultivation, can solve the problems of high one-time input cost, easy drought of strawberry seedlings, cumbersome water management, etc., and achieve the effects of easy operation and mastery, early flower bud differentiation, and early maturity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] A trough type strawberry safe seedling raising method with adjustable water level, comprising the following steps:
[0051] (1) Construction of the rain shelter: build a rain shelter with length × width = 61m × 7.4m;
[0052] (2) Excavation and construction of the trough: dig and build the trough in an orderly manner in the rain shelter. ×9cm) orderly enclosure, so that the actual height of the trough reaches 14cm;
[0053] (3) Ground trough leveling: Use agricultural machinery to crush and level the soil in the arch shed, use an outdoor level to level the ground in each trough, use sieved fine soil to fill up the unevenness, and then compact it. To prevent surface subsidence, after compaction, use hollow bricks to enclose 4 trenches in an orderly manner. The distance between the walkways between the trenches is 0.4m, and the distance between the front and rear walkways of the shed is 0.5m. Place a single layer around each trench to form a trench;
[0054] (4) Laying ...
Embodiment 2
[0061] A trough type strawberry safe seedling raising method with adjustable water level, comprising the following steps:
[0062] (1) Construction of the rain shelter: build a rain shelter with length × width = 54m × 10.9m;
[0063] (2) Excavation and construction of the trough: dig and build the trough in an orderly manner in the rain shelter. ×9cm) orderly enclosure, so that the actual height of the trough reaches 14cm;
[0064] (3) Ground trough leveling: Use agricultural machinery to crush and level the soil in the arch shed, use an outdoor level to level the ground in each trough, use sieved fine soil to fill up the unevenness, and then compact it. To prevent ground subsidence, after compaction, use hollow bricks to enclose 6 trenches in an orderly manner. The distance between the walkways between the trenches is 0.4m, and the distance between the front and rear walkways of the shed is 0.5m. Place a single layer around each trench to form a trench;
[0065] (4) Laying ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com