Evolved node b and traffic scheduling method
An evolutionary node and traffic scheduling technology, applied in network traffic/resource management, wireless communication, electrical components, etc., can solve problems such as difficult user experience quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Hereinafter, implementation examples according to the present application will be described in detail with reference to accompanying drawings, so that those skilled in the art can easily understand. In some places, known structures and devices are simply shown in simplified drawings, descriptions of well-known parts are omitted, and the same reference numerals represent the same elements in this application.
[0040] figure 1 A schematic diagram of an embodiment of a network 100 according to the present application is shown, and the network 100 includes a first eNodeB 102 and a second eNodeB 104 . Such as figure 1 As shown, the first eNodeB 102 is connected to the second eNodeB 104 through a backend network BH, and the coverage of the second eNodeB 104 is within the coverage of the first eNodeB 102, and the coverage of the first eNodeB 102 The coverage area is larger than that of the second eNodeB 104. The second eNodeB 104 may act as a base station and may serve use...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


