A method for controlling overfilling concrete at the top of bored piles
A technology of bored piles and poured concrete, which is applied in the direction of sheet pile walls, buildings, and foundation structure engineering, can solve the problems of time-consuming and costly, and achieve the effects of shortening the construction period, saving costs, and improving economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described below in conjunction with accompanying drawing of description, but protection scope of the present invention is not limited thereto:
[0024] A kind of method of controlling bored cast-in-place pile pile top superfilling concrete of the present invention, comprises the following steps:
[0025] 1) Construction of bored pile holes: construction of bored pile holes is carried out according to the design requirements;
[0026] 2) Concrete pouring: pour concrete into the drilled cast-in-place pile hole obtained in step 1), and pour the concrete above the design superfill height, the design superfill height is 1.5-2.0D or 500cm above the pile top, where D is the diameter of the bored pile;
[0027] 3) Concrete scouring: connect the top of the improved drill pipe to the drilling rig, extend the bottom of the drill pipe to the design pile top elevation of the bored pile, then turn on the mud pump connected to the drilling rig, a...