Crossing existing line bridge girder dismounting method
A technology for existing lines and bridges, which is applied in the field of demolition of main beams of existing bridges on the upper span to achieve the effect of reducing management costs, reducing mechanical input costs, and reducing construction costs
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2017-01-04
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a method for removing a main girder of a bridge spanning an existing line. Background technique
[0002] In recent years, with the rapid development of national transportation infrastructure, some expressways built in the early stage can no longer fully meet the needs of current traffic volume, and the existing expressway reconstruction and expansion projects are increasing day by day. In particular, the bearing capacity of the original expressway bridges spanning the existing railway lines has declined, and it is almost unable to meet the increasing traffic load. It is imminent to strengthen and reconstruct those bridges with insufficient bearing capacity. In the construction of expressway reconstruction and expansion adjacent to or across the existing railway line, it has become a new research topic in the field of engineering construction and transporta...
Examples
Embodiment Construction
[0061] Such as figure 1 A method for dismantling the main girder of a bridge spanning an existing line is shown. The main girder of the bridge to be removed is a main girder spanning the existing railway line. The multiple beam sections 14 to be removed have the same structure and are all reinforced concrete beam sections, and the beam sections 14 to be removed are assembled from M reinforced concrete T beams 15 from left to right, wherein M is positive Integer and M≥3; the front and rear ends of the beam section 14 to be removed are respectively supported on a supporting pier, and the bridge deck pavement layer is laid on the beam section 14 to be removed; for any one of the beam sections to be removed When carrying out the demolition construction of the whole group in section 14, the following steps are included:
[0062] Step 1, bridge deck pavement milling: milling the bridge deck pavement on the currently constructed beam section;
[0063] The currently constructed beam...