Nuclear power plant rod control system test device and method
A system test and nuclear power plant technology, applied in nuclear power generation, nuclear engineering, nuclear reactor monitoring, etc., can solve the problems of cumbersome testing process and difficult data analysis, and achieve the effect of convenient operation and improved operation reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] see figure 1, the test device for the rod control system of a nuclear power plant proposed in Embodiment 1, the main structure includes a power supply system 10, a KVM device 20, an industrial computer 30, a data acquisition system 40, an interface cabinet 50, a microphone device 60 and a printer 70; the power supply system 10 is not Connect with industrial computer 30, KVM equipment 20, interface cabinet 50 power supply; Described KVM equipment 20, data acquisition system 40 and printer 70 are connected with industrial computer 30 electrical signals respectively; Described interface cabinet 50 has the isolation module 51 that is connected with each other and Interface board 52; the isolation module 51 is connected to the data acquisition system 40 by electrical signals, so as to meet the complex electrical environment requirements on site, and prevent external current and voltage shocks from causing damage to the board; the interface board 52 is electrically connected t...
Embodiment 2
[0051] see figure 2 , Embodiment two is a test method for a nuclear power plant rod control system realized on the basis of embodiment one, which specifically includes a control rod drive mechanism noise recording test method; the control rod drive mechanism noise record test method includes the following steps :
[0052] S100. Provide a user with a testable rod set through an operation interface in the form of a configuration file.
[0053] S200. Select the corresponding tested rod group from the testable rod groups according to the user instruction, and receive the information input by the user including the initial rod position step size, power station name, unit, user name, temperature and pressure.
[0054] S300. Establish a control rod driving mechanism test data folder based on the power station name, the unit unit, and the tested rod group.
[0055] S400. Collect signal data including the noise signal of the claw action, and the current time-series signals of the st...
Embodiment 3
[0063] see image 3 , the nuclear power plant rod control system test method that embodiment three proposes is on the basis of embodiment two, also includes the rod position channel re-qualification test method; Described rod position channel re-qualification test method comprises the following steps:
[0064] L100. Receive the information set by the user, including the name of the power station, unit unit, group of rods to be tested, user name, temperature and pressure.
[0065] L200, based on the name of the power station, the unit, and the tested rod group, establish the rod position channel and re-qualify the test data folder.
[0066] L300, collect the rod position scanning signal of the rod position monitoring unit cabinet to identify the rod group corresponding to the current measurement rod position signal; and collect the rod position command signal of the control logic cabinet and the rod position measurement signal of the rod position measurement cabinet.
[0067] ...
PUM