Unlock instant, AI-driven research and patent intelligence for your innovation.

Service chain resource scheduling method and device

A technology of resource scheduling and service chaining, which is applied in the field of data communication, can solve problems such as insufficient resource usage, waste of server link bandwidth resources, path reentry, etc., and achieve the effect of optimal service chain path selection

Active Publication Date: 2019-08-23
CHINA TELECOM CORP LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The current business chain resource scheduling algorithms include Round Robin (polling), Least Load (minimum load) and Random (random), which are generally relatively simple and do not fully use resources. The foldback problem causes a waste of link bandwidth resources between servers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Service chain resource scheduling method and device
  • Service chain resource scheduling method and device
  • Service chain resource scheduling method and device

Examples

Experimental program
Comparison scheme
Effect test

no. 1 Embodiment

[0166] Figure 13 It is a schematic diagram of network resources in the first specific embodiment of the present invention. like Figure 13 As shown, in this embodiment, a virtual function unit has been preset on the serial networking device, so there is no need to perform network function initialization operations. The service chain resource scheduling method in this embodiment specifically includes:

[0167] Step 1. Obtain the user's business chain requirement information. Among them, the passing sequence of network elements with required functions is: DPI->FW->NAT.

[0168] attached Figure 13 The current CPU and memory usage of each VM is marked in , assuming that the average resource consumption of virtual function network elements by users is shown in the following table:

[0169] DPI FW NAT CPU 0.3% 0.2% 0.15% Memory 0.25% 0.1% 0.1%

[0170] Step 2. Resource check. Compare Figure 13 The current CPU and memory usage of each VM...

specific Embodiment 2

[0181] Figure 14 It is a schematic diagram of network resources in the second specific embodiment of the present invention. like Figure 14 As shown, in this embodiment, a virtual function unit has been preset on the serial networking device, so there is no need to perform network function initialization operations. The service chain resource scheduling method in this embodiment specifically includes:

[0182] Step 1. Obtain the user's business chain requirement information. Among them, the passing sequence of network elements with required functions is: DPI->NAT->FW

[0183] attached Figure 14 The current CPU and memory usage of each VM is marked in , assuming that the average resource consumption of virtual function network elements by users is shown in the following table:

[0184] DPI FW NAT CPU 0.3% 0.2% 0.15% Memory 0.25% 0.1% 0.1%

[0185] Step 2. Resource check. Compare Figure 13 The current CPU and memory usage of each VM...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a service chain resource scheduling method and device. The method includes: obtaining service chain requirement information of the user, wherein the service chain requirement information includes required function network elements and the passing order of required function network elements; determining all feasible paths according to the passing sequence of required function network elements; obtaining all feasible paths The length of the path and the number of users received by the path; according to the path length of all feasible paths and the number of users received by the path, select the user's business chain path from all feasible paths. By considering multiple resource optimizations, the present invention optimizes the use of the three resources of virtual machine CPU, virtual machine memory, and inter-server link bandwidth, and performs load balancing from the perspective of the entire path, thereby realizing a better service chain Path Selection.

Description

technical field [0001] The invention relates to the field of data communication, in particular to a service chain resource scheduling method and device. Background technique [0002] The service chain is a hot application scenario of NFV (Network Function Virtualization, network function virtualization) technology. At present, the business chain networking mode is relatively flexible - there are serial, star and hybrid. Due to the strong correlation between service chain deployment and topology, different networking methods will lead to different service chain deployment methods. Service chain resource scheduling involves many factors: whether the functional network element is preset in advance or the configuration is temporarily triggered by the customer; when multiple devices run the same functional network element, which device should be selected to serve the user, etc. [0003] The current business chain resource scheduling algorithms include Round Robin (polling), Lea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04L12/803H04L29/08
CPCH04L47/125H04L67/60
Inventor 罗雨佳欧亮唐宏王勇刘汉江
Owner CHINA TELECOM CORP LTD