Energy distribution and control method and device
A technology of energy distribution and control method, applied in the field of energy management, which can solve problems such as reducing office user experience and inoperability of the office
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] Embodiment 1. The embodiment of the present invention provides an energy distribution control method, such as figure 1 Shown include:
[0065] S101. Obtain the total energy Q1 distributed by the energy supply equipment to at least one room.
[0066] S102. Obtain energy Q2 actually required by at least one room.
[0067] S103. Obtain the energy supply priority of each room.
[0068] S104. When Q1
[0069] The energy distribution control method provided by the embodiment of the present invention acquires the total energy Q1 distributed by the energy supply equipment for at least one room, and acquires the energy Q2 actually required by at least one room; and then judges the energy supply equipment by judging the sizes of Q1 and Q2 The energy provided for different equipment; among the...
Embodiment 2
[0070] Embodiment 2. The embodiment of the present invention provides an energy distribution control method, such as figure 1 Shown include:
[0071] S101. Obtain the total energy Q1 distributed by the energy supply equipment to at least one room.
[0072] S102. Obtain energy Q2 actually required by at least one room.
[0073] S103. Obtain the energy supply priority of each room.
[0074] It should be noted that since each room itself does not have an energy supply priority, it is necessary to set the energy supply priority according to the actual situation. The specific settings are as follows:
[0075] Specifically, obtain the energy supply priority of each room, including:
[0076] Obtain the coefficient value r preconfigured by the user for each room, where 0
[0077] Acquire the total energy demand Q3 of each room within the first preset time.
[0078] A peak schedule of energy demand of at least one room for a second preset time is obtained.
[0079] Construct...
Embodiment 3
[0101]Embodiment 3, the embodiment of the present invention provides an energy distribution control device 10, such as figure 2 Shown include:
[0102] A data unit 1010, configured to obtain the total energy Q1 distributed by the energy supply equipment for at least one room;
[0103] The data unit 1010 is also used to acquire the energy Q2 actually required by at least one room;
[0104] A parameter configuration unit 1020, configured to acquire the energy supply priority of each room;
[0105] A judging unit 1030, configured to judge the size relationship between Q1 and Q2 acquired by the data unit 1010;
[0106] The energy supply unit 1040 is used for judging Q1
[0107] The energy distributi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com