Geotextile material composite ecological riverbank protection structure and construction method thereof
A technology of ecological revetment and geotechnical materials, applied in infrastructure engineering, excavation, coastline protection, etc., can solve the problem of difficulty in ensuring the integrity and protective effect of vegetation cover, interruption of connectivity between bank slope soil and water, and vegetation on the surface of ecological bags Low survival rate and other problems, achieve good consolidation effect, effective slope consolidation and erosion resistance, and ensure the effect of integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Such as figure 1 As shown, a kind of geotechnical material composite ecological revetment structure of the present embodiment, it comprises foot protection structure 4, is located at the multi-layer ecological bag layer 2 above described foot protection structure 4, and is used to fix described ecological bag layer 2 The fixed structure; wherein, the multi-layer ecological bag layer 2 is laid in staggered layers to form a slope angle; there are several biological branches 3 arranged at intervals between two adjacent layers of the ecological bag layer 2 .
[0030] In this embodiment, the grass species in the ecological bag of the ecological bag layer 2 and the biological branches 3 placed in two adjacent ecological bag layers 2 form a multi-species and multi-level composite vegetation structure. On the one hand The biological branches 3 can be firmly rooted in the slope soil 1 to improve the overall anti-skid performance of the geotechnical material composite ecological ...
Embodiment 2
[0039] As a convertible implementation, the difference between this embodiment and Embodiment 1 is that when the original bank slope is a gentle slope, the foot protection structure 4 is selected as a riprap foot protection, and the riprap The natural slope of the riprap foot protection is 1:1.5-1:2.0, and the thickness of the riprap foot protection is greater than 0.5m; wherein, the riprap particle size of the riprap foot protection can be adjusted according to the flow velocity and the slope. It is estimated that when laid, the ecological bags of the ecological bag layer 2 form a flat bag structure.
Embodiment 3
[0041] On the basis of embodiments 1 and 2, this embodiment further provides a manufacturing method for embodiment 1 or embodiment 2, which includes the following steps:
[0042] S1, trimming the slope soil 1 to be protected;
[0043] S2. Set the foot protection structure 4 at the bottom of the slope soil body 1,
[0044] S3. After the ecological bag is filled with the mixture, it is turned over to form a flat bag, and then it is laid layer by layer from bottom to top. After one layer of ecological bag layer 2 is laid, place biological branches 3 at intervals on the ecological bag layer 2, and then start a new process. Laying of one layer of ecological bag layer 2;
[0045] S4. After laying the ecological bag layer 2 at the top, fix the ecological bag layer 2 with a fixing structure.
[0046] When this embodiment is used in the construction of a geotechnical material composite ecological revetment structure described in Embodiment 1, when step S2 is implemented, the anti-fil...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com