Wind farm active power control method and system
A technology of active power and control method, which is applied in the field of wind farm active power control methods and systems, can solve problems such as the maximum change limit of wind farm active power exceeding the limit, and achieve the effect of satisfying safe and stable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] A wind farm active power control method disclosed in Embodiment 1 of the present invention is applied to a wind farm active power control system. The flow chart is as follows figure 1 As shown, the active power control methods of wind farms include:
[0068] S101, collecting the active power of the public coupling point of the wind farm in units of set time;
[0069] In the process of executing step S101, the active power control system of the wind farm collects the active power of the common coupling point of the wind farm according to the preset setting time. Preferably, the setting time is 1 second, and the active power control system of the wind farm The active power of the public coupling point of the wind farm is collected every second.
[0070] S102. Calculate the maximum and minimum values of active power of the wind farm that are allowed to be adjusted based on the active power of the common coupling point of the wind farm within a preset time and the preset...
Embodiment 2
[0078] Based on the method for controlling the active power of a wind farm disclosed in the first embodiment of the present invention, as figure 1 In step S102 shown, when the preset time includes a first preset time and a second preset time, the first preset time is 60 seconds, the second preset time is N minutes, and the value of N is greater than 1 , based on the active power of the public coupling point of the wind farm within the preset time and the preset maximum change limit of active power, the specific execution process of calculating the maximum and minimum active power of the wind farm that is allowed to be adjusted is as follows: figure 2 shown, including the following steps:
[0079] S201. Obtain the first active power of the common coupling point of the wind farm 60 seconds ahead, and use the sum of the first active power and the maximum change limit of the first active power preset in the previous 60 seconds as the wind power that is allowed to be adjusted in t...
Embodiment 3
[0106] Based on the wind farm active power control methods provided by the above-mentioned embodiments of the present invention, the third embodiment of the present invention discloses a wind farm active power control system that implements the above-mentioned wind farm active power control method, and its structural diagram is as follows Figure 5 As shown, the wind farm active power control system 500 includes:
[0107] The collection module 501 is used to collect the active power of the public coupling point of the wind farm in units of set time;
[0108] Calculation module 502, configured to calculate the maximum and minimum values of active power of the wind farm that are allowed to be adjusted based on the active power of the common coupling point of the wind farm within a preset time and the preset maximum change limit of active power;
[0109] The scheduling range adjustment module 503 is used to adjust the actual scheduling target value to the range of the minimum a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com