UE scheduling method, device and base station
The technology of a scheduling device and a scheduling method, which is applied in the field of communication, can solve problems such as reducing system throughput, increasing system load, and resource waste, and achieves the effect of eliminating feedback ambiguity, small impact, and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0048] The embodiment of the present invention discloses a UE scheduling method, combining figure 1 As shown, the method includes:
[0049] Step 101: When scheduling the current UE, the base station judges whether the hybrid automatic repeat request (HARQ) may cause feedback ambiguity if the current UE is scheduled on the current subframe.
[0050]In the TDD-LTE system, the number of uplink and downlink subframes is not necessarily symmetrical. In a configuration where there are more downlink subframes than uplink subframes, there may be a situation in which HARQ of multiple downlink subframes are reported simultaneously in one uplink subframe. The number of downlink subframes reported is equal to the length of the feedback window, which is jointly determined by the subframe configuration of the LTE system and the current scheduled subframe. In order to solve the HARQ feedback ambiguity that may occur when the base station schedules UEs, the base station first needs to deter...
no. 2 example
[0060] This embodiment discloses a UE scheduling method, combining figure 2 As shown, it includes: Step 201: when scheduling the current UE, the base station judges whether scheduling the current UE on the current subframe may cause hybrid automatic repeat request (HARQ) feedback ambiguity; Whether the scheduling times in the fixed window exceeds the threshold range; Step 203: If the scheduling times of the current UE in the current binding window exceeds the threshold range, then give up scheduling the current UE on the current subframe, determine the next UE to be scheduled, and send the next A UE to be scheduled is used as the currently scheduled UE, and returns to the first step.
[0061] Specifically, due to the analysis, in the multiplexing feedback mode of the TDD system, when the binding window length is 4, the number of combinations of the corresponding ACK / NACK resource index and 2-bit data in the standard is not enough, and the same 2-bit data appears There are mu...
no. 3 example
[0082] combine Figure 6 , Figure 7 As shown, this embodiment discloses an apparatus for scheduling a user equipment UE, including: a first judgment module 301 , a determination module 302 and an abandonment scheduling module 303 .
[0083] The first judging module 301 is configured to judge, when scheduling the current UE, whether the hybrid automatic repeat request (HARQ) may cause feedback ambiguity if the current UE is scheduled on the current subframe.
[0084] The determining module 302 is configured to, if yes, determine whether the number of scheduling times of the current UE within the current binding window exceeds a threshold range.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


