[0045] Embodiment one: if figure 1 As shown, a municipal inspection well includes a well cover 1 and a well body 2 formed by bricks. The bottom of the well body 2 is provided with a vertical passage section 3 and a sewage pipe inspection section 4 and a rainwater pipe inspection section 5 respectively located at the bottom and middle of the vertical passage section 3. The diameters of the sewage pipe inspection section 4 and the rainwater pipe inspection section 5 are larger than the vertical The diameter of the straight channel section 3. People's ladder 6 is installed on the inwall of vertical passage section 3 to facilitate people to climb up and down from vertical passage section 3. Since the sewage pipe inspection section 4 and the rainwater pipe inspection section 5 are respectively located at the bottom and middle of the vertical channel section 3, and the two are not connected, there is no need to set an additional cover plate to separate the sewage pipe inspection se...
Embodiment 2
[0051] Embodiment 2: A construction method of a municipal inspection well, comprising:
[0052] Step a, foundation pit excavation;
[0053] Excavate the foundation pit with a slope of 68 degrees, and the diameter of the bottom surface of the foundation pit is larger than the diameter of the inspection section 4 of the sewage pipe; after that, the bottom surface of the foundation pit is compacted.
[0054] Step b, placing the sewage section module;
[0055] The bottom of the foundation pit is placed into the sewage section module.
[0056] Step c, bricking to form the vertical channel section 3 on the lower floor;
[0057] The upper opening of the sewage section module is brick-built to form the lower vertical channel section 3, and the masonry is laid horizontally in separate skins, and the upper and lower joints are staggered, and the inside and outside are built. The daily height of the masonry shall not exceed 1.2m. When the masonry process is temporarily interrupted for...