Black-start method in consideration of participation of HVDC transmission system
A power transmission system, high-voltage direct current technology, applied in the direction of AC network circuits, circuit devices, power transmission AC networks, etc., can solve the problem of the lack of qualitative and quantitative evaluation of the impact of the system recovery at the time of startup, so as to avoid system collapse and improve Self-healing and recovery ability, optimizing the effect of the black start scheme
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075]In this embodiment, the grid A is taken as an example to illustrate the feasibility of the present invention. What needs to be explained is that the black start process of the grid A is started in the form of partitions, and then networking is carried out after the partition grid is formed. Taking the GD joint division as an example, the C power plant is used as the black start unit to carry out the black start of the GD joint division, and the high-voltage direct current transmission system is added to the black start process. The implementation process is as follows:
[0076] Step 1: Read in the data parameters of the bus, lines, transformers, high reactance, generators, important loads and DC drop points in the power network to be started, and establish a network connection model. Among them, the data parameters of the DC drop point of the GD joint partition are shown in Table 1.
[0077] Table 1 Data parameters of DC landing point in GD joint partition
[0078] ...