The invention discloses a
network construction type
energy storage control method and
system suitable for
black start, and the method comprises the steps: obtaining a three-phase current actual value of a converter side to judge whether an
overcurrent fault occurs or not, and switching off a pulse modulation
signal of a switching device in a converter when the
overcurrent fault is judged to occur; when it is judged that the
overcurrent fault does not occur, a three-phase
voltage instruction value, output by the
power control loop, of the converter is obtained; obtaining a three-phase current actual value of the converter side, enabling the three-phase current actual value to sequentially pass through the virtual
resistor and the high-pass filter to obtain a three-phase
voltage compensation value, and obtaining a three-phase
capacitance current actual value, corresponding to the three-phase
voltage compensation value, in the high-pass filter; the difference value between the three-phase voltage instruction value and the three-phase
voltage compensation value is used as a compensated three-phase voltage instruction value; and determining a pulse modulation
signal of a switching device in the converter according to a difference value between the actual value of the three-phase
capacitance current passing through the damping coefficient and the compensated three-phase voltage instruction value. Wave sealing control is applied,
fault current limiting is achieved, and the stability of a
power grid is improved.