Planning method of power grid matched with city comprehensive pipe gallery

A technology for comprehensive utility corridor and power grid planning, applied in the direction of instruments, data processing applications, resources, etc., can solve the problems of low efficiency, underground comprehensive utility corridor without the theory and method of graph theory from the perspective of electric power, and achieve enhanced and reasonable Sexuality, beneficial to docking and integration, and improving work efficiency

Active Publication Date: 2018-05-25
GUIZHOU UNIV
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to provide a planning method for the supporting power grid of the urban comprehensive utility gallery, so as to solve the problem that the construction of the underground comprehensive utility gallery in the prior art does not systematically analyze the planning method of

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Planning method of power grid matched with city comprehensive pipe gallery
  • Planning method of power grid matched with city comprehensive pipe gallery
  • Planning method of power grid matched with city comprehensive pipe gallery

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] A method for planning a power grid supporting an urban comprehensive utility gallery, comprising:

[0040] Step 1. Preparation of planning data for the supporting grid of the comprehensive utility corridor;

[0041] Step 2. Construction and calculation of the planning model of the supporting grid for the integrated utility corridor;

[0042] Step 3. Discrimination of the construction sequence of the supporting power grid project of the comprehensive utility gallery;

[0043] Step 4. Two-dimensional display of power lines and utility corridor roads in the planning results of the integrated utility corridor supporting grid

[0044] The preparation of supporting grid planning data for the comprehensive utility corridor includes grid data and urban planning data. Among them, the power grid data includes relevant information on all existing and newly built power lines in the planning area during the planning year; urban planning data includes the construction of relevant p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a planning method of a power grid matched with a city comprehensive pipe gallery. The method comprises the steps of planning data preparation of the power grid matched with thecomprehensive pipe gallery; planning model establishment and calculation of the power grid matched with the comprehensive pipe gallery; time sequence judgement of engineering construction of the power grid matched with the comprehensive pipe gallery; double-dimensional display of an electric power line and a pipe gallery road of a planning result of the power grid matched with the comprehensive pipe gallery. According to the planning method, the problems are solved that in the prior art, during construction of the underground comprehensive pipe gallery, a planning method that the power grid matched with the city comprehensive pipe gallery is deeply and systematically analyzed from the electric power profession aspect is not provided, related planning is conducted only by depending on workexperience of planning personnel and without combination with the theory and method, and the efficiency is extremely low for planning of the large-scale city power distribution grid pipe gallery.

Description

technical field [0001] The invention belongs to the grid planning technology, and in particular relates to a grid planning method for an urban comprehensive utility gallery. Background technique [0002] The incorporation of electric power and other pipelines into the underground comprehensive pipeline corridor is a major change in the development mode of urban pipeline construction in China today, and is one of the important symbols of the modernization of new urban municipal infrastructure construction in the 21st century. It is conducive to improving the reliability, safety and service life of power and other pipelines; it plays a key role in saving and utilizing urban ground land and underground space, and improving the city's comprehensive carrying capacity; it plays a key role in improving the quality of new urbanization development and creating economic development New dynamics are of great significance. Therefore, with the large-scale development of my country's urb...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06313G06Q10/0637G06Q50/06
Inventor 韩松洪伟彬李洪乾殷蔚翎
Owner GUIZHOU UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products