A resource scheduling method and base station

A resource scheduling and base station technology, which is applied in transmission path sub-channel allocation, digital transmission system, signaling allocation, etc., can solve the problems of long time consumption, large transmission delay, resource waste, etc., to save time and improve resource scheduling Efficiency and the effect of saving transmission time

Active Publication Date: 2020-04-28
SHANGHAI HUAWEI TECH CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the above-mentioned uplink scheduling process, if the distance between the BBU and the RRU is relatively long, it will take a long time for the above-mentioned decoding result to be sent by the BBU to the RRU, so that the time when the BBU receives the above-mentioned decoding result is already at the end of the process. After the scheduling time, the scheduling time is missed. In this case, the process scheduling cannot be carried out this time, and it can only be suspended until the next process scheduling. Therefore, the transmission delay between the BBU and the RRU is too large, which will cause hybrid automatic re-starting. The hybrid automatic repeat request (HARQ) process is suspended, and scheduling resources cannot be used for new transmission or retransmission scheduling, resulting in waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A resource scheduling method and base station
  • A resource scheduling method and base station
  • A resource scheduling method and base station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0059] The present application provides a resource scheduling method and a base station, which are used to eliminate the transmission delay between the BBU and the RRU, so that resource scheduling can be performed normally, and avoid waste of scheduling resources.

[0060] The technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Apparently, the described embodiments are only some of the embodiments of this application, not all of them.

[0061] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present application and the above drawings are used to distinguish similar objects, and not necessarily Used to describe a specific sequence or sequence. It is to be understood that the terms so used are interchangeable under appropriate circumstances such that the embodiments described herein can be practiced in sequences other than those illustrated...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present application discloses a resource scheduling method and a base station, which are used to eliminate the transmission time delay between the baseband unit and the remote radio unit, so that resource scheduling can be performed normally, and avoid waste of scheduling resources. The method of this application includes: the radio remote unit receives the new transmission management frame sent by the baseband unit; the radio remote unit decodes the uplink data sent by the terminal to obtain a decoding result; if the radio remote unit After receiving the retransmission management frame sent by the baseband unit, the radio remote unit sends first confirmation information to the terminal according to the decoding result, and the first confirmation information includes the new transmission management frame or the retransmission management frame; if the radio frequency unit does not receive the retransmission management frame, the radio remote unit sends second confirmation information to the terminal, and the second confirmation information is used to indicate the Do not perform resource scheduling for the HARQ process for the first time, and wait for the next resource scheduling.

Description

technical field [0001] The present application relates to the technical field of mobile communication, and in particular to a resource scheduling method and a base station. Background technique [0002] In the long term evolution (LTE) technology, the base station architecture in the mobile communication network adopts a distributed base station architecture, that is, the base station is divided into a near-end unit and a remote unit, wherein the near-end unit is also called a baseband unit (BBU). ), the remote unit is also called a radio remote unit (radio remote unit, RRU), and the BBU and the RRU are connected through an optical fiber. [0003] During the uplink scheduling process of the base station, when the process starts, the BBU sends the uplink transmission resource scheduling, and sends the scheduling result to the RRU. After the RRU receives the uplink data sent by the user equipment (UE), the RRU performs Decode and obtain the decoding result. After the BBU rece...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): H04L5/00H04W72/12H04W88/08
CPCH04L5/0053H04W88/085H04W72/535
Inventor 童娟娟陈拓楼群芳温冀妮
Owner SHANGHAI HUAWEI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products