High-yield scorpion outdoor breeding method
A breeding method and scorpion technology, applied in animal husbandry and other fields, can solve the problems of affecting the normal growth and development of scorpions, killing each other, and the difficulty of scorpion molt, so as to reduce intra-species competition, prevent killing each other, and reduce the effect of agglomeration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0022] Example 1:
[0023] A high-yield scorpion outdoor breeding method includes the following steps:
[0024] (1) Build a tower-shaped scorpion nest: select the hilly terrain to build a tower-shaped scorpion nest. The outermost layer of the tower-shaped scorpion nest is a water tank. The width of the water tank is 0.5m. The water tank surrounds the outer soil layer and the outer soil layer surrounds the first step. The first step layer surrounds the second step layer, the second step layer surrounds the third step layer, and the third step layer surrounds the top layer. The height of the first step layer, the second step layer and the third step layer are all 1m. The widths of the first, second and third steps are all 2m. The first, second, third and top floors are all equipped with gravel walls and green belts. There are hardened soil sections, which are made of cement. Each layer is equipped with light bulbs. The bulbs are electrically connected by wires. The green belt is pla...
Example Embodiment
[0026] Example 2:
[0027] A high-yield scorpion outdoor breeding method includes the following steps:
[0028] (1) Build a tower-shaped scorpion nest: select the hilly terrain to build a tower-shaped scorpion nest. The outermost layer of the tower-shaped scorpion nest is a water tank. The width of the water tank is 0.8m. The water tank surrounds the outer soil layer, and the outer soil layer surrounds the first step. The first step layer surrounds the second step layer, the second step layer surrounds the third step layer, and the third step layer surrounds the top layer. The height of the first step layer, the second step layer and the third step layer are all 1m. The widths of the first, second and third steps are all 2m. The first, second, third and top floors are all equipped with gravel walls and green belts. There are hardened soil sections, which are made by pouring cement. The hardened soil sections are equipped with bulbs, which are electrically connected by wires. The g...
PUM
Property | Measurement | Unit |
---|---|---|
Height | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap