A method for distributing incremental benefits of multi-stakeholder hydropower station reservoir group joint operation
A joint scheduling and allocation method technology, applied in the direction of instruments, data processing applications, resources, etc., can solve the problem of lack of incremental benefit allocation mechanism
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0101] In the following description, numerous specific details are given in order to provide a more thorough understanding of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without one or more of these details. In other examples, some technical features known in the art are not described in order to avoid confusion with the present invention.
[0102]The technical solutions of the present invention will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.
[0103] A multi-stakeholder hydropower station reservoir group joint scheduling incremental benefit distribution method, such as figure 1 shown, including the following steps:
[0104] (1) Collect, sort out and study the data related to the compilation of power generation dispatching plans for the hydropower station reservoir group system, including long series observation data of natura...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


