An improved multi-stakeholder joint scheduling method based on Kaldor-Hicks
A joint scheduling and main body technology, applied in the direction of instruments, data processing applications, forecasting, etc., to achieve the effect of ensuring interests and enthusiasm
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The calculation example is used for verification below, and the specific implementation manner of the present invention is described in detail in conjunction with the technical scheme and accompanying drawings. The calculation example is exemplary, and is intended to explain the specific modeling implementation process in the present invention, rather than limit the scope of the present invention and its application.
[0041] The structural diagram of the electric-thermal coupling system of the example is as follows: figure 1 shown. There are 9 thermal power units in the system, including 7 extraction steam cogeneration units and 2 condensing steam units, of which units 1-3 and 5-8 are cogeneration units, and units 4 and 9 are Pure condensation unit. Units 1-4 belong to Power Generation Group I, and Units 5-9 belong to Power Generation Group II. The two power generation groups are different power generation stakeholders, and each owns a wind farm with installed capac...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


