Management method of project progress and cost management system

A technology of management system and management method, applied in the management field of project progress and cost management system, can solve problems such as inability to achieve intelligence, reminders without the slightest force, and easy to be ignored.

Inactive Publication Date: 2019-01-01
CHONGQING VOCATIONAL INST OF ENG
View PDF7 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing building information model is not mature, and a lot of data cannot be directly entered into the building information model, and it needs to be manually converted before it can be included in the model management
More importantly, the current building information model is still not sufficiently intelligent, and project progress management still mainly relies on managers to prepare schedule plans based on past construction experience, and then the building information model will remind according to the time node according to the prepared plan
[0003] However, as the patent document CN103337005B discloses a management method of a project progress and cost management system, although this method will remind according to the planned nodes of the construction plan, this kind of reminder is just like a chat software that is easily ignored. It is just a reminder message. When the project progress lags behind the construction plan, there is no effective early warning method, and the reminder is not the slightest effort, so that the project progress management is completely passive

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Management method of project progress and cost management system
  • Management method of project progress and cost management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Further detailed explanation through specific implementation mode below:

[0035] Such as figure 1 As shown, the management method of the project progress and cost management system includes the following steps: in the system, a three-dimensional engineering model is established with the component as the basic unit; each component in the three-dimensional engineering model is attached with the specification information of the corresponding component, The project is divided into several stations according to the process. The so-called components refer to the elements that constitute the project and have independent structures and functions. Based on this, the engineering 3D model is also composed of several component 3D models. Different from physical components, the three-dimensional model of each component is also the information carrier of the corresponding component, and all information related to the component is attached to the corresponding three-dimensional mod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a management method of a project progress and cost management system, which relates to the field of project management, comprising the following steps: establishing a project three-dimensional model with a component as a basic constituent unit; determining the quantity information and the estimated unit price information of each component at each station according to the component specification information; determining the estimated cost information of each component at each station according to the quantity information of each component at each station and the estimated unit price information, and binding the estimated cost information to the corresponding component in the three-dimensional model of the project; receiving project schedule information; receiving theactual progress information and the actual cost information of each component at each station; setting the progress deviation threshold; setting cost deviation threshold; the early warning information including a traffic order for returning a participant to the project site. The application can promptly remind participants to complete the construction plan according to the time node.

Description

technical field [0001] The invention relates to the field of engineering project management, in particular to a management method of an engineering progress and cost management system. Background technique [0002] With the rapid development of network technology, building information modeling is used to incorporate all links in a construction project into model management, whether it is construction drawings, construction progress, construction materials, personnel allocation, etc. All information is incorporated into the management of the building information model. However, the existing building information model is not mature, and a lot of data cannot be directly entered into the building information model, and it needs to be manually converted before it can be included in the model management. More importantly, the current building information model is still not sufficiently intelligent, and project progress management still mainly relies on managers to compile schedul...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/063116G06Q10/06313G06Q50/08
Inventor 李红立王贵珍郭心莲谯川李远航陈静陈仪
Owner CHONGQING VOCATIONAL INST OF ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products