Device and system for condensing and absorbing recovery of hydrogen chloride industrial waste gas
A technology of industrial waste gas and recovery device, which is applied in steam condensation, chemical instruments and methods, gas treatment, etc., can solve the problems of secondary environmental pollution, large consumption of chemicals, and high operating costs, and reduce operating costs and salt content. The effect of reducing and reducing the consumption of medicine
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] figure 1 Schematic diagram of the structure of the hydrogen chloride industrial waste gas condensation absorption recovery device provided in this embodiment; figure 1 As shown, this embodiment provides a hydrogen chloride industrial waste gas condensation absorption recovery device, including a first condenser 100, the first condenser 100 includes a first shell 101, and the inside of the first shell 101 is vertically provided with a plurality of The first heat exchange tube 102, the top of the first housing 101 is provided with a first atomizing shower, and the bottom of the first housing 101 is provided with a first cooling water inlet 105, a first gas inlet 106 and a condensate recovery liquid outlet 107, the first gas inlets 106 communicate with the bottom ends of the plurality of first heat exchange tubes 102 respectively, and the top of the housing is provided with a first cooling water outlet 108 and a first gas outlet 109, and the first gas outlets 109 are respe...
Embodiment 2
[0043] This embodiment provides a hydrogen chloride industrial waste gas condensation absorption recovery device. This embodiment is an improvement on the basis of Embodiment 1. The technical solution described in Embodiment 1 also belongs to this embodiment, and will not be repeated here.
[0044] figure 2 Schematic diagram of the structure of the hydrogen chloride industrial waste gas condensation absorption recovery device provided in this embodiment; figure 2 As shown, the hydrogen chloride industrial waste gas condensation absorption recovery device provided in this embodiment also includes a second condenser 200, the second condenser 200 is arranged above the first condenser 100, and the second condenser 200 includes a second shell 201, The inside of the second housing 201 is provided with a plurality of second heat exchange tubes 202, the top of the second housing 201 is provided with a second atomizing shower, and the bottom of the second housing 201 is provided with...
Embodiment 3
[0058] This embodiment provides a hydrogen chloride industrial waste gas condensation absorption recovery system. This embodiment is an improvement on the basis of Embodiment 1 or Embodiment 2. The technical solution described in Embodiment 1 or Embodiment 2 also belongs to this embodiment. This will not be repeated here.
[0059] This embodiment provides a hydrogen chloride industrial waste gas condensation recovery system, including the hydrogen chloride industrial waste gas condensation absorption recovery device provided in Embodiment 1 or 2, the absorption tower and the neutralization tower, the hydrogen chloride industrial waste gas condensation absorption recovery device, the absorption tower and the The neutralization towers are connected successively.
[0060] In the hydrogen chloride industrial waste gas condensation absorption recovery system provided in this embodiment, the hydrogen chloride industrial waste gas is condensed and absorbed through the hydrogen chlori...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

