A user scheduling method and device in a high-speed rail mobile communication network
A mobile communication network and user scheduling technology, applied in the field of user scheduling methods and devices in high-speed rail mobile communication networks, can solve problems such as unreasonable resource scheduling, waste of resources, etc., and achieve the effects of rational resource scheduling improvement and avoiding continuous monitoring.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] An embodiment of the present application provides a user scheduling method in a high-speed rail mobile communication network, such as figure 2 As shown, the method includes the following steps:
[0041] S101. Obtain statistical information on the number of users in a high-speed rail private network community.
[0042] Exemplarily, obtaining the statistical information on the number of users of the high-speed rail private network community may be to obtain the number of second-level users per day in the high-speed rail private network community for 7 days a week or more than 4 weeks, which can ensure the accuracy of the statistical information.
[0043] S102. Determine the daily arrival time and departure time of the train according to the statistical information of the number of users.
[0044] Specifically, such as image 3 As shown, the above step S102 includes steps S1021-S1022:
[0045] S1021. Obtain a periodic pulse distribution of the number of users according...
Embodiment 2
[0075] An embodiment of the present application provides a user scheduling device in a high-speed rail mobile communication network, such as Figure 14 As shown, the user scheduling device 20 includes: an acquisition module 21 , a determination module 22 , and a migration module 23 .
[0076] The acquiring module 21 is configured to acquire statistical information on the number of users of the high-speed rail private network community.
[0077] Exemplarily, in order to ensure the accuracy rate, the number of second-level users per day in the high-speed rail private network community is obtained for 7 days a week and more than 4 weeks.
[0078] The determination module 22 is configured to determine the daily arrival time and departure time of the train according to the statistical information of the number of users obtained by the acquisition module 21 .
[0079] Specifically, the determination module 22 obtains the periodic pulse distribution of the number of users according ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com