Tensile force back-pull connection device between building foundation pile and upward-pull cross beam
A technology of connecting device and foundation pile, which is applied in the fields of tension connection parts and tension conversion parts, can solve the problems of broken large steel pipes, weak welding, and welding requirements that cannot be guaranteed by welding.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Embodiment 1, the pull-back connection device between the building foundation pile and the upward pulling beam
[0021] Such as figure 1 , 2 , 3, 4, 1. The pull-back connection device between the building foundation pile and the upward pulling beam, including the load-bearing perforated plate 1, the inner and outer sleeve tensioning and locking devices 2 connected to the building foundation pile and the upper tensioning beam The tie rod combination device 3 of the beam is connected to the inner and outer sleeves of the building foundation pile and the tightening and locking device 2 is used to connect the building foundation pile with the load-bearing perforated plate 1, and the tie rod combination device 3 connected to the pull-up beam connects the pull-up beam to the load-bearing plate. The load perforated plate 1 is connected; so that the three objects of the building foundation pile, the load-bearing perforated plate 1 and the upward pulling beam are connected into...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


