Cement prefabricated component forming equipment for railways
A technology of prefabricated components and forming equipment, applied in the direction of ceramic molding machines, manufacturing tools, etc., can solve the problems of easy movement of steel bars, large space occupation, and long consumption of bolts, so as to save time, reduce space occupation, and reduce the effect. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3 As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear sid...
Embodiment 2
[0021] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear side...
Embodiment 3
[0024] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3 As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear sid...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


