Unlock instant, AI-driven research and patent intelligence for your innovation.

Cement prefabricated component forming equipment for railways

A technology of prefabricated components and forming equipment, applied in the direction of ceramic molding machines, manufacturing tools, etc., can solve the problems of easy movement of steel bars, large space occupation, and long consumption of bolts, so as to save time, reduce space occupation, and reduce the effect. Effect

Active Publication Date: 2019-06-07
义乌市优创知识产权运营有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to overcome the disadvantages of the current cement prefabricated component forming equipment, such as long time-consuming installation of bolts, large space occupation, and easy movement of the steel frame, the technical problem of the present invention is to provide a machine that can directly pour the bolts in, occupies a small space and is easy to move. Concrete prefabricated component molding equipment for railways that can fix steel frames

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cement prefabricated component forming equipment for railways
  • Cement prefabricated component forming equipment for railways
  • Cement prefabricated component forming equipment for railways

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0019] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3 As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear sid...

Embodiment 2

[0021] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear side...

Embodiment 3

[0024] A kind of cement prefabricated component forming equipment for railway, such as Figure 1-3 As shown, it includes a base 1, a pressure block 5, a connecting rod 7, a butterfly bolt 8, a first baffle 9, a first hinge 91, a second baffle 10, a third baffle 11 and a locking device 12, There is a trapezoidal groove 2 on the upper part of the base 1, and two grooves 3 are opened on the left and right sides of the lower part of the base 1. The groove 3 communicates with the trapezoidal groove 2. The long bolt 4 and the pressing block 5 are placed in the groove 3. The long bolt 4 Located on the rear side of the briquetting block 5, the front sides of the left and right briquetting blocks 5 are provided with a connecting rod 7, the middle part of the connecting rod 7 is rotatably provided with a butterfly bolt 8, the middle part of the base 1 is provided with a threaded hole 6, and the rear end of the butterfly bolt 8 is located at In the threaded hole 6, the front and rear sid...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to forming equipment, in particular to cement prefabricated component forming equipment for railways. The cement prefabricated component forming equipment for the railways can directly cast in bolts, is less in occupied space, and can fix reinforcement frames. The cement prefabricated component forming equipment for the railways comprises a base, pressing blocks, connecting rods, butterfly bolts and the like; a trapezoidal groove is formed in the upper part of the base; two grooves are formed in the left and right sides of the lower part of the base; the grooves communicate with the trapezoidal groove; long bolts and the pressing blocks are placed in the grooves; the long bolts are positioned on the back sides of the pressing blocks; and the connecting rods are arranged on the front sides of the pressing blocks on the left and right sides. Through arrangement of the pressing blocks, the connecting rods and the butterfly bolts, the positions of the long bolts can be fixed, and the long bolts can be directly cast in cement prefabricated components, so that the condition of installation of the long bolts after casting of the cement prefabricated components is saved, and the people time can be saved, and the efficiency is higher.

Description

technical field [0001] The invention relates to a forming device, in particular to a forming device for a cement prefabricated component used in railways. Background technique [0002] In railway construction, people need to use cement prefabricated components to support the rails and fix the rails. At present, when people make cement prefabricated components, they usually reserve a hole for installing bolts, and install them when the rails are laid. It is relatively low and consumes a long time. When the cement prefabricated components cannot be used, they need to be replaced, which will bring troubles to people and prolong the construction period. It is convenient for transportation and placement; when people are pouring cement prefabricated components, they do not fix the steel frame. The steel bars in the finished cement prefabricated elements are exposed, reducing the effect of the steel bars. Contents of the invention [0003] In order to overcome the disadvantages...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B28B1/14B28B7/00B28B23/02B28B23/00
Inventor 徐倩
Owner 义乌市优创知识产权运营有限公司