Project progress method and system for project supervision
A project schedule and engineering project technology, applied in the project schedule method and system field of engineering supervision, can solve problems such as waste of human resources, cumbersome project work, not meeting the requirements of automated office, etc., and achieve the effect of ensuring safety and improving efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] In one embodiment, as figure 1 Shown, be the project schedule method of a kind of engineering supervision disclosed by the present invention, specifically comprise the following steps:
[0047] S10: Establish a project supervision project according to the project content and project supervision standards.
[0048] In this embodiment, the content of the engineering project refers to the specific content in the engineering construction obtained through on-site survey and planning based on the survey results. Project supervision standards refer to the standards formulated according to the project construction documents approved by the state, laws and regulations related to project construction, project construction supervision contracts and other project construction contracts during project supervision. The engineering supervision project refers to the project that monitors and manages the corresponding project in the actual construction.
[0049] Specifically, when est...
Embodiment 2
[0087] In one embodiment, a project schedule system for engineering supervision is provided, and the project schedule system for engineering supervision corresponds one-to-one to the project schedule method for engineering supervision in the above-mentioned embodiments. Such as Figure 6 As shown, the project schedule system for engineering supervision includes a project establishment module 10 , a schedule acquisition module 20 , a block chain construction module 30 and a monitoring module 40 . The detailed description of each functional module is as follows:
[0088] The project establishment module 10 is used to establish an engineering supervision project according to the engineering project content and engineering supervision standards;
[0089] Schedule acquisition module 20, used to acquire the supervision schedule according to the engineering supervision project;
[0090] The block chain construction module 30 is used to obtain each process node in the supervision sc...