Construction method of throwing stones to packing sedimentation for pond backfilling
A construction method and pond technology, applied in infrastructure engineering, roads, soil protection, etc., can solve the problems of silt easily existing in the cracks of gravel, incomplete silt removal, and insufficient roadbed strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] This embodiment provides a pond backfill riprap construction method, including the following steps: select a center point N in the central area of the pond, and then pass through the center point N through three reference lines, and the angle between adjacent reference lines is 60°, the two ends of all reference lines form intersections with the edge of the pond, which are the intersections A, B, C, D, E, and F respectively, and then set up a sludge pump at the intersections A, B, C, D, E, and F pump, while throwing stones into the pond, the silt squeezed to the edge of the pond is sucked away by six silt pumps.
[0020] Furthermore, before throwing rocks, the surface vegetation and construction waste within the throwing range should be removed with an excavator, and at the same time cooperate with manual cleaning.