Work scheduling assignment method and system

A work scheduling and work technology, applied in the field of power management, can solve the problems that the efficiency of manual assignment cannot meet the actual work needs, and the workload of distribution network scheduling is large, so as to improve the reliability of power supply, reduce the crossover of work, and improve the efficiency of assignment Effect

Pending Publication Date: 2020-02-14
SHENZHEN POWER SUPPLY BUREAU
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The technical problem to be solved by the embodiments of the present invention is to provide a work scheduling assignment method and system to solve the problems that the current distribution network scheduling workload is large and the efficiency of manual assignment methods cannot meet the actual work needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Work scheduling assignment method and system
  • Work scheduling assignment method and system
  • Work scheduling assignment method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0048] Such as figure 1 As shown in FIG. 1 , it shows a schematic diagram of the architecture of an embodiment of a work scheduling assignment system provided by the present invention. In this embodiment, the system includes:

[0049] The planned work acquisition module is used to obtain all types of planned work in various business systems through the data interface;

[0050] In a specific embodiment, the planned work acquisition module outputs the work planned to be carried out and planned to be completed within the on-duty time to the standard quantification module, and the planned work in execution that is completed in the off-duty period is sent to the administrator, according to The workload is distributed.

[0051] The standard quantification module is u...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a work scheduling assignment method and system. The work scheduling assignment system comprises a plan work obtaining module which is used for obtaining all types of plan workin all business systems through a data interface, a standard quantification module which is used for setting a unified standard for all different planned work businesses and determining a key elementof a single work, and an intelligent dispatching module which is used for carrying out intelligent dispatching on all planned work after the system obtains the information of the on-duty dispatcher. By implementing the work scheduling assignment method and system, the time required for scheduling work assignment is shortened, and the distribution network scheduling work assignment efficiency is improved, and the power supply reliability is improved, and the work intersection is reduced.

Description

technical field [0001] The invention belongs to the field of electric power management, and relates to a method and system for assigning work scheduling. Background technique [0002] With the gradual development of the distribution network, the equipment under the jurisdiction of the distribution network dispatching is also increasing year by year. At present, distribution network dispatching is based on paper as the carrier, and it is completely dependent on manual assignment. The average assignment time is 30 minutes, and the efficiency is extremely low. In this process, if substation and regional bureau personnel apply for planning work, the dispatcher will not be able to reply, which will affect the normal development of planning work. Therefore, it is particularly important to study an intelligent allocation algorithm for planning work to realize intelligent allocation. [0003] With the development of the company and the constant changes in the external environment, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/063118G06Q50/06
Inventor 曹仲南李扬胡兆华吴悠曾翔
Owner SHENZHEN POWER SUPPLY BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products