Concrete replacement construction method for high-rise frame columns based on active control technology
An active control, high-rise frame technology, applied in the direction of columns, pillars, piers, etc., to achieve the effect of less consumption, easy installation and turnover, and light weight
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] 1. Concrete column drilling and coring steps
[0038] figure 1 It is a schematic diagram of the coring position of the concrete frame column. In order to facilitate the work of the coring machine, the actual coring position is determined according to the current situation of the site structure. Basically, the vertical distance between the center position of the coring and the bottom of the beam or the top of the slab is 200mm.
[0039] Before setting out the coring position of the concrete frame column, first use the steel bar scanner to determine the position of the main reinforcement and stirrup, and try to avoid damaging the main reinforcement of the concrete frame column during the construction process.
[0040] The coring adopts water transfer hole to obtain the steel pin socket 11 on the concrete frame column, inserts a 40Cr steel pin 31 with a diameter of 44mm into the steel pin socket, and installs the connection node I for the stress system conversion. In orde...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



