Construction device, construction system and construction method for hollow pile structure
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA RAILWAY ERYUAN ENG GRP CO LTD
- Publication Date
- 2021-08-03
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of geotechnical engineering, in particular to a construction device, a construction system and a construction method for a hollow pile-slab structure. Background technique
[0002] The uplift deformation of rock and soil foundations is a key problem to be solved in many projects nowadays. In the field of high-speed ballastless railways, frost heaving of permafrost, expansive rock (soil) expansion, red bed soft rock arching, saline soil (rock) salt Arching of the foundation caused by swelling and other factors is a new type of problem for railway builders. Due to the extremely strict requirements on the deformation control of high-speed ballastless railways, once the deformation of the foundation uplift exceeds the limit, it is easy to cause cracks in the ballastless track slabs of high-speed railways, causing major ballastless track defects, affecting the stability and comfort of train operation, and causing...