Full-suspension four-point engagement type super-large converter mounting method
An installation method and super-large technology, which is applied in the field of full-suspension four-point meshing super-large converter installation, which can solve the problems of difficult control of weld gap deviation, high-altitude furnace shell assembly, difficult control of welding quality, and feeding across metallurgical bridge cranes. frequent use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention is further illustrated below by specific examples.
[0042] A method for installing a full-suspension four-point meshing super-large converter, including
[0043] Step 1. Preliminary preparation;
[0044] Step 1.1 Acceptance of foundation handover, embedding and measurement of central marking plate and elevation datum point;
[0045] Step 1.2 Check and retest the center distance, verticality and elevation of anchor bolts;
[0046] Step 1.3 Install the backing plate of the converter bearing support;
[0047] Step 1.4 The special inspection of the 450 / 80t metallurgical bridge crane with a feeding span of 450 / 80t is completed, and the workshop is closed;
[0048] Step 1.5 Feeding span 450 / 80t metallurgical bridge crane hook removal, design and manufacture of supports;
[0049] Step 1.6 The main beam of the structural frame of the operating platform in front of the furnace with a feeding span of +11.35m has been installed;
[0050] Step 2, bearing...