Continuous alternating tunnel face advanced anchor bolt layout method
A face, alternating technology, applied in the installation of bolts, mining equipment, earth-moving drilling and other directions, can solve the problems of increasing the cost of lap length support and reducing the economic benefits of support, and achieve a stable and strong support. The effect of practicality and broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0024] In this embodiment, the specific engineering data are as follows: the tunnel is excavated in full section, the single excavation footage is 2m, the maximum excavation height of the tunnel face is about 11m, the maximum excavation span is about 13m, and the excavation cross-sectional area is about 115m 2 .
[0025] In the existing technology, when the anchor bolts ahead of the tunnel face are laid according to the conventional scheme, the bolt support length will be continuously shortened with the excavation of the tunnel, see figure 1 , there is an obvious weakening process of the support effect, which is very unfavorable for the deformation control of the face. In order to solve this problem, the present invention provides a method for laying out advance bolts on the tunnel face in a continuous and alternating manner. It inc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


