BIM-based rockery modular construction method and device and storage medium
A construction method and modular technology, applied in 3D modeling, design optimization/simulation, image data processing, etc., can solve problems such as construction difficulties in large-scale rockery on-site, achieve simple and orderly construction process, reasonable operation, and reduce construction costs. effect of cycles
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-01-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of rockery installation and construction, in particular to a BIM-based rockery modular construction method, device and storage medium. Background technique
[0002] In recent years, theme parks have become more and more popular. The rockery in theme parks can not only be used as decorative artificial landscapes, but also be closely integrated with functional amusement facilities and themed restaurants to form a unique themed cultural background. entertainment venues. The structure of the rockery is mainly reinforced concrete structure, and its shape is also based on the direct weaving of the steel skeleton on site. For the larger rockery monomer, due to its irregular shape, the regularity of installation and correction on the site is poor. Using traditional construction methods to weave steel bars on site requires extremely high technical and artistic levels of construction personnel, and it is difficult to...
Examples
Embodiment 1
[0041] Additional aspects and advantages of embodiments of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of embodiments of the invention. figure 1 It is a flow chart of a BIM-based rockery modular construction method provided by an embodiment of the present invention, such as figure 1 As shown, the method includes the following steps:
[0042] S1: Establish a comprehensive BIM model of the rockery.
[0043] S2: Perform modular splitting on the comprehensive BIM model of the rockery to obtain multiple regional modules, and mark and name the multiple regional modules.
[0044] S3: Review and optimize each regional module of the comprehensive BIM model of the rockery, and generate a QR code for each regional module of the primary and secondary structure model of the rockery according to the optimization result.
[0045] S4: Using the two-dimensional code to perform dynamic constr...
Embodiment 2
[0068] The embodiment of the present invention also provides a BIM-based rockery modular disassembly construction device, including a memory, a processor, and a computer program stored in the memory and operable on the processor, and the processor executes the The steps described in the above-mentioned various embodiments are realized when the computer program is described, for example figure 1 Steps S1~S5 shown.
[0069] The terminal device may be computing devices such as computers, notebooks, palmtop computers, and cloud servers. The terminal device may include, but not limited to, a processor and a memory. Those skilled in the art can understand that the schematic diagram is only an example of a terminal device and does not constitute a limitation to the terminal device. It may include more or less components than those shown in the figure, or combine certain components, or have different Components, for example, the terminal device may also include an input and output d...
Embodiment 3
[0073] If the integrated modules / units of the terminal equipment are realized in the form of software function units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the present invention realizes all or part of the processes in the methods of the above embodiments, and can also be completed by instructing related hardware through computer programs. The computer program can be stored in a computer-readable storage medium, and the computer When the program is executed by the processor, the steps in the above-mentioned various method embodiments can be realized. Wherein, the computer program includes computer program code, and the computer program code may be in the form of source code, object code, executable file or some intermediate form. The computer readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, removable hard disk, magn...