Power engineering construction block chain management system
A technology of electric power engineering and management system, applied in the field of electric power engineering, can solve the problems of inability to guarantee information security and low integration, and achieve the effects of promoting information exchange and resource sharing, preventing accidents, and saving management costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0050] There is a rural power distribution project implementation project: involving capacity expansion and transformation of 180 distribution transformer areas; 10 10kV lines with a total length of 50 kilometers; the planned total project volume is 50 million yuan.
[0051] conventional management
[0052] A) After the design party, construction party, supervisor and equipment supplier are determined through the bidding process:
[0053] Designer: 30 working days in total for site survey, record and measurement, 30 working days for each stage of design, 60 working days in total, or 30 days;
[0054] Constructor: 15 working days in total for on-site investigation and re-measurement, 15 working days for formulating construction plans and preparations, 460 working days for each link, a total of 490 working days, or 98 days;
[0055] Supervision party: the supervision of each link has a total of 100 working days;
[0056] Equipment supplier: supply the equipment and materials r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com