Wall green construction method based on BIM technology
A construction method and wall technology, applied to structural elements, building components, buildings, etc., can solve the problems of large energy consumption and long time-consuming hyperbolic curtain walls
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039]The present invention will be further described in detail below with reference to the accompanying drawings.
[0040]Such asfigure 1 As shown, the present application provides a wall-based green construction method based on BIM technology, including the following steps:
[0041]S1: According to the two-dimensional drawings of the wall and the terrain of the construction site, establish a three-dimensional BIM model to be housed, and determine the prefabricated shear wall 2 and the prefabricated floor plate 1 installation position to be repaired;
[0042]When actually operation, the creation method of the three-dimensional BIM model is as follows: Draw the three-dimensional simulation model of the wall to be housed by Revit-based MagicAd software based on Revit, then load the wall in the three-dimensional simulation model. The dynamic assembly process of the wall is built, and the creation of the three-dimensional BIM model can also be completed. The application and the dynamic process ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com