Earthquake early warning method and system for high-speed rail
A technology for earthquake early warning and high-speed rail, which can be used in alarms, instruments, etc., to solve problems such as low degree of integration and inability to communicate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] like figure 1 As shown, this embodiment provides a high-speed rail earthquake early warning method, which includes step S1, step S2, step S3 and step S4.
[0073] Step S1. Acquiring train data, the train data includes running route, train traveling direction and current position data;
[0074] The train data corresponds to a high-speed train.
[0075] Step S2. Find the first monitoring data according to the running route, the train traveling direction and the current position data, the first monitoring data is the geological stability of the first seismic zone that the train will pass through corresponding to the train data sexual data;
[0076] In the method step, the current position data is used to divide the running line into two-end lines, one section is the road section that the high-speed train has passed, and the other section is the road section that the high-speed train will pass through. Confirm the road section to be passed, the current position data can ...
Embodiment 2
[0111] like figure 2 As shown, the present embodiment provides a high-speed rail earthquake early warning system, characterized in that, comprising:
[0112] The first data acquisition module 71 is used to acquire train data, and the train data includes running route, train traveling direction and current position data;
[0113] The first calculation module 72 is used to find the first monitoring data according to the running route, the train traveling direction and the current position data, the first monitoring data is the first earthquake that the train corresponding to the train data will pass through On-board geological stability data;
[0114] The second calculation module 73 is used to obtain earthquake prediction data according to the first monitoring data, and the earthquake prediction data is data for predicting the occurrence of earthquakes;
[0115] The third calculation module 74 is configured to send an early warning instruction to the corresponding train acco...
Embodiment 3
[0142] Corresponding to the above method embodiment, the embodiment of the present disclosure also provides a high-speed rail earthquake early warning device. The high-speed rail earthquake early warning device described below and the high-speed rail earthquake early warning method described above can be referred to in correspondence.
[0143] image 3 It is a block diagram of a high-speed rail earthquake early warning device 800 according to an exemplary embodiment. like image 3 As shown, the electronic device 800 may include: a processor 801 and a memory 802 . The electronic device 800 may also include one or more of a multimedia component 803 , an input / output (I / O) interface 804 , and a communication component 805 .
[0144] Wherein, the processor 801 is used to control the overall operation of the electronic device 800, so as to complete all or part of the steps in the above-mentioned high-speed rail earthquake early warning method. The memory 802 is used to store var...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com