Intelligent early warning analysis decision-making method applied to hydropower project quality control
A technology of early warning analysis and hydropower engineering, applied in data processing applications, instruments, resources, etc., can solve the time-consuming and labor-intensive problems of hydropower engineering quality control, and achieve the effect of time-consuming and labor-intensive solutions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] S01. Acquiring unit project quality acceptance information, the information includes construction site, construction type, unit project name, unit project quality assessment grade, contract bid section name, and influencing factors of unit project quality assessment grade;
[0020] S02. Classify and count the unit project quality acceptance information according to the name of the contract section, select the N unit projects that have been completed recently in the same contract section name, and calculate the excellent rate of the N unit projects. If the N unit projects are excellent If the rate is lower than the excellent rate of the first N unit projects, an early warning message will be given for the contract bid section name to reduce the excellent rate;
[0021] S03. Put an attribute label on the early warning information; the attribute label includes the construction site with the lowest good rate, the construction type with the lowest good rate, and the influenci...