A salt discharge structure for restoration and treatment of coastal saline-alkali land
A saline-alkali land and coastal technology, applied in the application, soil lifting machinery, agriculture, etc., can solve the problems of easily damaged soil structure, slow repair speed, long action period, etc., and achieve remarkable results and avoid soil erosion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] see Figure 1-8 As shown, the present invention is a salt discharge structure for restoration and treatment of coastal saline-alkali land, including a solid foundation revetment 1, a salt washing pipe 2, a circulation well 3 and an infiltration pipe group, wherein the solid foundation revetment 1 and the infiltration pipe group are both Buried in the soil layer of the saline-alkali land to be repaired, the circulation well 3 is set up in the offshore of the saline-alkali land, the solid foundation revetment 1 is set in the offshore of the saline-alkali land, and the salt washing pipe 2 is set on the surface of the saline-alkali land; the infiltration pipe group includes the high-permeability pipe 4 And the low-permeability pipe 5, wherein the high-permeability pipe 4 is installed below the low-permeability pipe 5, and both are communicated with the circulation well 3; the salt washing pipe 2 is installed above the low-permeability pipe 5, and is communicated with the cir...
Embodiment 2
[0034]In order to deal with the desalinated water on the surface of the saline-alkali land and the soil of the planting layer above, the infiltration pipe group also includes two confluence boxes 6, and the two confluence boxes 6 are respectively bolted and communicated with several high-permeability pipes 4 and several low-permeability pipes 5, and each infiltration The infiltration water of the tube group is collected and collected, and the eluted salt is deposited; the confluence box 6 and the circulation well 3 are bolted and communicated with a confluence pipe 601 .
Embodiment 3
[0036] In order to cope with the short-term rise of the groundwater level and balance the distribution of moisture and salt in the soil, a number of electro-hydraulic rods 1011 are installed on the lower surface of the connecting beam 101, and the electro-hydraulic rods 1011 extend to the inside of the revetment pipe 102; the output ends of the electro-hydraulic rods 1011 are welded There is a hydraulic plate 1012, and the hydraulic plate 1012 and the inside of the revetment pipe 102 form a piston structure; the inside of the revetment pipe 102 is provided with a piezoelectric valve 1023 and a sliding rod 1024, wherein the piezoelectric valve 1023 and the sliding rod 1024 are socketed, and the two are slidably matched The piezoelectric valve 1023 is welded with the inner surface of the revetment pipe 102; the buoy plate 1025 is welded on the lower end surface of the slide rod 1024, and the baffle plate 1026 is welded on the upper end surface; the piezoelectric valve 1023 is elec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


