Early warning method and device for task exception and storage medium
A task and abnormal technology, applied in the computer field, can solve problems such as delays in post-mortem analysis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] The following will clearly and completely describe the technical solutions in the embodiments of the present disclosure with reference to the drawings in the embodiments of the present disclosure.
[0045] Unless otherwise specified, descriptions such as "first" and "second" in the present disclosure are used to distinguish different objects, and are not used to indicate meanings such as size or timing.
[0046] figure 1 A schematic flowchart showing a method for early warning of task abnormality in some embodiments of the present disclosure.
[0047] Such as figure 1 As shown, the method of this embodiment includes: steps 110-140.
[0048] In step 110, the actual data volume of the task in the past time period is obtained.
[0049] Wherein, the past time period includes, for example: a preset first number of past time periods closest to the current time period. Based on the actual data volume of the past time period closest to the current time period, the data volu...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


