A method for making generalized diagram of flood control joint scheduling scheme for reservoir groups based on gojs
A technology of joint scheduling and production method, applied in image data processing, extraction from basic elements, generation of 2D images, etc., to achieve the effect of convenient storage and transmission
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] A method for making a generalized diagram of a flood control joint scheduling scheme for reservoir groups based on Gojs, such as figure 1 shown, including the following process:
[0028] 1) Generalize the natural elements and engineering in the watershed: generalize the natural and social elements and reservoir engineering in the watershed into the watershed unit, interval unit, confluence point unit, reservoir unit, protection object unit, and reach unit. Six types of units; for the natural watershed directly flowing into the reservoir, it is generalized as a watershed unit; for the upstream non-natural watershed, but a watershed with reservoir engineering, it is generalized as an interval unit from the reservoir section to the watershed outlet; for the tributaries, The nodes where the main currents meet are generalized as confluence point units; for reservoir projects with flood regulation capability in the basin, they are generalized as reservoir units; for impo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


