Method for treating foundation by combined hammers
A technology of foundation treatment and combined hammer, which is applied in the direction of foundation structure engineering, soil protection, construction, etc., can solve the problems of poor soil compaction effect between piers, limited reinforcement depth, and low strength improvement, so as to improve the bearing capacity of the foundation, Effect of reducing settlement difference, reducing settlement amount and settlement difference
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A combined hammer foundation treatment method:
[0037] 1. According to geological data and architectural design planning, the ground shall be leveled and rammed, and the processing range shall not be less than 3 meters outside the edge of the building.
[0038] 2. Determine the geometric dimensions of the foundation plane and the tamping point of the structural load arrangement, and carry out measurement and positioning.
[0039] 3. Comprehensive construction:
[0040] (1) Using the characteristics of different hammer shapes, pressures and dynamic pressure equivalents, the deep, middle and shallow soils are respectively reinforced by layered tamping and replacement to form an A-shaped rammed replacement pier or reinforcement. , compacted body and influence body, that is, figure 2 Schematic of the 3D vertical complex shown.
[0041] (2) In the process of forming the compacted replacement pier or reinforcement, the soil between the piers is reinforced, and a new repl...
Embodiment 2
[0049] A combined hammer foundation treatment method:
[0050] 1. According to geological data and architectural design planning, the ground shall be leveled and rammed, and the processing range shall not be less than 3 meters outside the edge of the building.
[0051] 2. Determine the geometric dimensions of the foundation plane and the tamping point of the structural load arrangement, and carry out measurement and positioning.
[0052] 3. Comprehensive construction:
[0053] (1) Using the characteristics of different hammer shapes, pressures and dynamic pressure equivalents, the deep, middle and shallow soils are respectively reinforced by layered tamping and replacement to form an A-shaped rammed replacement pier or reinforcement. , compacted body and influence body, that is, figure 2 Schematic of the 3D vertical complex shown.
[0054] (2) In the process of forming the compacted replacement pier or reinforcement, the soil between the piers is reinforced, and a new replac...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com