Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11 results about "Design planning" patented technology

3D printing process of bipolar current collector

The invention discloses a 3D printing process of a bipolar current collector, and relates to the technical field of battery manufacturing. According to the 3D printing process of the bipolar current collector, the bipolar structure is formed by 3D printing of the aluminum layer on the surface of the copper foil, the preparation method comprises the steps of design planning, material preparation, 3D printing and heat treatment, and the mechanical property, the conductivity and the interface bonding performance of the current collector are optimized. The invention develops a 3D printing bipolar current collector technology which gives consideration to material collaborative optimization, complex structure manufacturing and interface stability improvement, and becomes a key breakthrough point for promoting the development of batteries with high energy density and long service life.
Owner:JIANGYIN NANOPORE INNOVATIVE MATERIALS TECH LTD

Architectural design planning scheme generation method and device based on artificial intelligence, and medium

The invention discloses a building design planning scheme generation method and device based on artificial intelligence, and a medium. The method comprises the following steps: step 1, obtaining building design historical data from a database; step 2, carrying out data processing on the building design historical data; 3, a second data set is obtained after data expansion; step 4, generating a plurality of expanded first design planning drawing data by using the trained generative adversarial network GAN model; merging the expanded first design planning drawing data to the second data set to obtain a third data set; 5, constructing an architectural design planning drawing generation model; 6, training an architectural design planning drawing generation model by using the third data set; and step 7, generating a plurality of design planning drawing data. According to the method, the problem of insufficient building design training samples is solved, and the building design planning drawing generation model is constructed to ensure the functional layout reasonability of the generated drawing.
Owner:中南建筑设计院股份有限公司 +1

Field surveying and mapping device for architectural design planning

The utility model discloses an on-site surveying and mapping device for building design planning, which comprises an adjusting cylinder, an adjusting rod is clamped on the inner wall of the adjusting cylinder, the upper surface of the adjusting rod is fixedly connected with an angle adjusting seat, the upper surface of the angle adjusting seat is fixedly connected with a quick connecting seat, and the upper surface of the quick connecting seat is fixedly connected with a measuring instrument body. The electric hydraulic push rod can be easily operated through the display control module to drive the adjusting rod to ascend and descend in the adjusting cylinder, so that the height of the measuring instrument body is accurately adjusted, the height requirements of different terrains and measuring targets can be rapidly met, manpower and time cost is greatly saved, angle adjustment is also easy and convenient, and the measuring instrument is convenient to use. The measuring instrument body can be rotated to a required angle by manually adjusting the angle adjusting seat, diversified measuring direction requirements are met, and in the working process of the measuring instrument body, an operator can check measuring data in real time through the display control module, and possible measuring deviation can be found and corrected in time.
Owner:CHANGJIANG CHONGQING NAVIGATION ENG INVESTIGATION DESIGNING INST

An assembly type bathroom external hanging component installation method

The application discloses an assembled bathroom external hanging component installation method and relates to the field of building construction, which comprises the following steps: early technical preparation, measurement and line laying, installation of a bathing safety seat, installation of an assembled wallboard washstand and installation of a wall surface external hanging assembly. The application greatly reduces the on-site construction workload through early design planning, factory production and direct on-site assembly, is simple and convenient to operate, is fast to construct and greatly shortens the construction period compared with traditional assembled wallboard external hanging component installation. In the application, the assembled bathroom external hanging components are produced in a factory according to the design and are strictly self-checked before being delivered, thereby greatly reducing the on-site construction steps and effectively guaranteeing the engineering quality. The application realizes precise drilling, ensures hole position accuracy, improves drilling convenience and equipment transportation convenience and guarantees drilling stability and reliability through the cooperation of the automatic drilling machine's movable walking mechanism, transverse moving mechanism, lifting adjustable drilling machine and longitudinal mechanism and the like.
Owner:CHINA CONSTR EIGHTH BUREAU CONSTR TECH (SHANDONG) CO LTD

Thermal transfer method using reactive ink transfer paper

The present invention relates to a fiber thermal transfer method using reactive ink transfer paper, and relates to digital printing, by means of a digital transfer printing device such as an inkjet printer, utilizing a computer from the design planning stage. The present invention, being a dry digital textile printing method with no steam and thickener used, is a waterless textile printing method which is ecofriendly.
Owner:CHON YOUNG SIK

Building design planning surveying and mapping tool and method thereof

The invention relates to the technical field of building design, in particular to a building design planning surveying and mapping tool and a method thereof.The building design planning surveying and mapping tool comprises a supporting frame, a supporting plate is arranged at the top of the supporting frame, a stroke groove is formed in the bottom of the supporting plate, and a stroke column is arranged on the surface of the stroke groove; the bottom of the stroke column is fixedly connected with the top of the supporting frame, a connecting piece is arranged on the outer side of the stroke column, and a protruding rod, a friction rod and a first torsional spring in the pasting mechanism are combined, so that the contact pressure can be adjusted according to the wall roughness and the friction coefficient; the friction rod moves towards the right side under the friction force and the resistance of the first torsional spring, extrusion force is applied to the extrusion ring through the insertion rod, the pushing spring is compressed, the pressure is increased, and on the contrary, when facing a smooth low-friction wall face (such as tiles and glass), the friction rod deforms through the first torsional spring, the pushing spring is not compressed, and the pressure is stable.
Owner:QINGDAO HONGFUBANG CONSTRUCTION ENGINEERING CO LTD

Digital construction method and system for adjusting and controlling installation flatness of aluminum-based metal curtain wall

The invention relates to the technical field of building curtain wall construction, and discloses a digital construction method and system for adjusting and controlling the installation flatness of an aluminum-based metal curtain wall, and the system comprises a design planning module, a processing control module, a measurement setting-out module, an installation execution module and a monitoring feedback module. By formulating curtain wall design planning data and determining plate grid division and reinforcing rib layout based on wind pressure load and finite element analysis, the clearness of flatness regulation and control of different curtain wall plates is guaranteed, meanwhile, the folding edge size, the diagonal length and the hanging point position of the plates are controlled through plate machining data, the accuracy of the machining link can be guaranteed in real time, and the machining efficiency is improved. The flatness deviation caused by machining errors is reduced, so that the accuracy and reliability of curtain wall installation flatness regulation and control are guaranteed, main body structure errors are digested in real time by generating construction surveying setting-out data and keel leveling data, keel installation deviation is controlled, and the deformation risk caused by accumulative errors and external factors is reduced.
Owner:LIAOCHENG UNIV +1

Metal roof bridge frame lamp installation method

The invention relates to the technical field of building engineering construction, and discloses a metal roof bridge frame lamp installation method which comprises the following steps: S1, a design planning stage: drawing a bridge frame lamp installation big sample drawing according to a metal roof structure, establishing a BIM three-dimensional model of a full assembly standard section, and optimizing an installation path and nodes after animation simulation; s2, a prefabrication processing stage: prefabricating a fluorocarbon spraying stainless steel bridge frame in a factory, and prefabricating an integrated bracket and a lamp in the factory based on the large sample drawing; and S3, a pre-assembling stage: in a warehouse, combining and assembling the prefabricated bridge frame, the bracket and the lamp according to the large sample drawing to form a pre-assembled standard section, and inspecting the assembling quality of the pre-assembled standard section. Through the mode of factory prefabrication, warehouse preassembly and on-site overall assembly, a large amount of high-altitude, high-risk and low-efficiency bulk operation is converted into ground, safe and efficient modular installation, the construction efficiency is remarkably improved, and the key project construction period is powerfully guaranteed.
Owner:CHINA SHANXI SIJIAN GRP

Assembly type bathroom external hanging component installation method

The invention discloses an assembly type bathroom external hanging component installation construction method, and relates to the field of building construction, and the method comprises the following steps: early-stage technical preparation, surveying and setting out, bathing safety seat stool installation, assembly type wallboard washstand installation and wall surface external hanging component installation. The on-site construction workload is greatly reduced, operation is easy and convenient, construction is rapid, and compared with a traditional assembly type wallboard external hanging component, the installation construction period is greatly shortened; the assembly type bathroom external hanging component is strictly produced in a factory according to design and is delivered after strict self-inspection, the site construction steps are greatly reduced, and the project quality can be effectively guaranteed; through cooperative operation of the retractable walking mechanism, the transverse moving mechanism, the lifting adjustable drilling machine, the longitudinal mechanism and other parts of the automatic drilling machine, precise drilling is achieved, the hole position precision is ensured, the drilling convenience and the equipment transportation convenience are improved, and the drilling stability and reliability are ensured.
Owner:CHINA CONSTR EIGHTH BUREAU CONSTR TECH (SHANDONG) CO LTD