Engineering construction project construction reporting method and equipment based on BIM

A construction project and engineering technology, applied in the field of BIM-based engineering construction project application, can solve problems such as low efficiency and long time consumption, and achieve the effect of improving work efficiency and saving time

Pending Publication Date: 2019-08-23
洛阳众智软件科技股份有限公司
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the related technology, when the construction unit applies for construction, it often needs the construction unit to carry the two-dimensional drawings of the building, relevant certification documents and other construction application materials to the construction admi

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering construction project construction reporting method and equipment based on BIM
  • Engineering construction project construction reporting method and equipment based on BIM
  • Engineering construction project construction reporting method and equipment based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0058] figure 1 It is a schematic flowchart of the BIM-based construction project application method provided by Embodiment 1 of the present invention. Such as figure 1 As shown, this embodiment provides a BIM-based engineering construction project reporting method, including:

[0059] Step 101, receiving the construction application instruction of the engineering construction project to be applied for construction;

[0060] Wherein, the report creation instruction may be a new report creation process selected by the user on the operation interface.

[0061] Step 102, after receiving the construction application instruction, obtain the 3D modeling file of the engineering construction project to be applied for construction, and the professional information of the engineering construction project to be applied for construction is attached to the 3D modeling file;

[0062] Among them, the obtained 3D modeling files can firstly establish 3D model files of engineering constructi...

Embodiment 2

[0067] figure 2 It is a schematic flowchart of the BIM-based construction project application method provided by the second embodiment of the present invention. Such as figure 2 As shown, this embodiment provides a BIM-based engineering construction project reporting method, including:

[0068] Step 201, receiving the construction application instruction of the engineering construction project to be submitted for construction;

[0069] In some embodiments, the report creation instruction may be a new report creation process selected by the user on the operation interface.

[0070] Wherein, the engineering construction project may be a construction project, an urban underground pipe network project, etc., wherein the construction project may be a factory building, a theater, a hotel, a store, a school, a hospital, a residence, etc.

[0071] Hereinafter, the engineering construction project is a residential project as an example for illustration, hereinafter referred to as ...

Embodiment 3

[0122] Figure 4 It is a schematic structural diagram of the BIM-based engineering construction project reporting equipment provided by Embodiment 3 of the present invention. Such as Figure 4 As shown, this embodiment provides a BIM-based engineering construction project reporting equipment, including:

[0123] A processor 401, and a memory 402 connected to the processor;

[0124] memory for storing computer programs;

[0125] The processor is used to call and execute the computer program in the memory, so as to execute the BIM-based engineering construction project reporting method as in the first or second embodiment.

[0126] For the specific implementation scheme of this embodiment, reference may be made to the relevant descriptions in the embodiments of the BIM-based engineering construction project application method in the first and second embodiments above, and will not be repeated here.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an engineering construction project construction reporting method and equipment based on BIM, and relates to the technical field of engineering construction. The method comprises the following steps of: receiving a construction instruction of a to-be-constructed engineering construction project; after a construction instruction is received, obtaining a three-dimensional modeling file of a to-be-constructed engineering construction project, wherein professional information of the to-be-constructed engineering construction project is attached to the three-dimensional modeling file; converting the three-dimensional modeling file to obtain the converted data, wherein the converted data comprise data of all elements in the design planning stage; and storing the converted data.

Description

technical field [0001] The invention relates to the technical field of engineering construction, in particular to a BIM-based engineering construction project reporting method and equipment. Background technique [0002] Urban architecture is the material basis for the city's survival and development. People need to rely on urban architecture for their offices and homes. When the construction unit needs to build a certain building in the city, it often needs to report to the local construction administrative department or its authorized agency, and then obtain the construction permit after review by the relevant department. [0003] In the related technology, when the construction unit applies for construction, it often needs the construction unit to carry the two-dimensional drawings of the building, relevant certification documents and other construction application materials to the construction administrative department for construction application. After receiving the co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08G06F17/50G06F17/22
CPCG06Q10/103G06Q50/08G06F30/13G06F40/151
Inventor 丁伟阮怀照刘从丰
Owner 洛阳众智软件科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products