Sinking construction method of sinking well with geology of gravel and pebble beds under saturated water condition
A pebble layer and caisson technology, applied in caisson, infrastructure engineering, construction and other directions, can solve the problems of low construction efficiency, large impact, and unfavorable caisson correction, and achieve the effects of low cost, flexible and convenient use, and high efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0017] like figure 1 , figure 2 Shown, under the saturated water condition of the present invention, geology is the caisson sinking construction method of sandstone, pebble layer, and concrete operation steps are as follows:
[0018] 1. The sand dredger 3 is hoisted into the caisson 1, and at the same time, two cranes 2 are used on the outside of the caisson 1 to coordinate construction;
[0019] 2. Adjust the position of the sand dredger 3, and fix the hull positioning rope 4 on the pulling bolt rod on the pool wall;
[0020] 3. Operate the bucket to control the track 5, so that the anchor rod at the front end of the track is anchored into the lower earthwork excavation 6 at the center of the caisson 1;
[0021] 4. Start the sand dredging equipment, and adjust the front positioning rope 4 again to ensure that the position of the sand dredger 3 do...