Construction method of red sandstone roadbed
A construction method and technology of red sandstone, applied in the direction of roads, roads, buildings, etc., can solve the problems of high utilization rate of machinery, can not guarantee the quality of roadbed filling, etc., save resources, be conducive to civilized construction and environmental protection, and be expensive. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0019] Embodiment: the red sandstone embankment construction method of the present invention adopts the following steps:
[0020] (1) The treatment of raw materials before construction. After the red sandstone is excavated by blasting, the large pieces of red sandstone are directly decomposed by a breaking hammer in the stockyard. The pre-construction disintegration treatment can effectively reduce the activity of the red sandstone.
[0021] (2) Harrowing and leveling, the decomposed red sandstone is transported to the construction site, the red sandstone filler is pushed flat with the bulldozer, the coarse particles are crushed with the help of the crawler belt, and then loosened by the loosening teeth dragged behind the bulldozer. And rake out the larger particles, then push and press the larger particles, and repeat this many times until the large particles are basically crushed. Generally, the number of times of raking and pressing should not be less than three times. Afte...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com