Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge

A key section and transmission capacity technology, applied in computing, electrical components, circuit devices, etc., can solve problems that do not conform to the definition mode of power generation area and load area of ​​the key section of the power grid, do not conform to the definition mode, and poor adaptability of the power grid

Active Publication Date: 2013-09-25
POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD +1
View PDF2 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] 1. The calculation uses all the power generation side as the power generation area and the load side as the load area, which does not conform to the definition mode of the power generation area and the load area of ​​the key section of the power grid in actual operation, and has poor adaptability to the actual operation of the power grid;
[0008] 2. The calculation adopts an extremely unfavorable power generation load growth mode, which is difficult or basically impossible to appear in the actual power grid operation. It does not conform to the definition mode of the power generation load growth mode of the key sections of the power grid in actual operation, and is less adaptable to the actual operation of the power grid. Difference

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge
  • Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge
  • Power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0057] A method for calculating the limit transmission capacity of key sections of the power grid considering manual dispatching knowledge proposed by the present invention is described in detail as follows in conjunction with the accompanying drawings and embodiments.

[0058] see figure 1 , the method of the present invention comprises the following steps:

[0059] 1) Definition of power generation area and load area

[0060] In the calculation process of the critical section limit transmission capacity, the definition of power generation area and load area has a great influence on the calculation results. In the existing calculation methods, the definition of power generation area and load area is generally the method of the entire power generation side and load side: the generator that can increase the output of the generator can increase the transmission power of the section is considered as the power generation area, and the load can be increased The load that increase...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A power grid key transmission section limit transmission capacity calculation method with consideration of artificial scheduling knowledge includes the steps of S 1) definition of an electricity generation area and a load area; S 2 definition of an electricity generation load increasing mode; S 3 calculation of key transmission section limit transmission capacity by the adoption of a continuous power flow mode. According to the power grid key transmission section limit transmission capacity calculation method with consideration of the artificial scheduling knowledge, the continuous power flow mode of an electricity generation area load area definition mode and the electricity generation load increasing mode with the consideration of the artificial scheduling knowledge is adopted to calculate the key transmission section limit transmission capacity, so the calculation result of the key transmission section limit transmission capacity is fitter for a power grid practical operational mode, adaptability of the key transmission section limit transmission capacity for power grid practical on-line operation is improved, and the result is more real and believable.

Description

technical field [0001] The invention relates to a method for calculating the limit transmission capacity of a key section of a power grid, in particular to a method for calculating the limit transmission capacity of a key section of a power grid considering manual scheduling knowledge. Background technique [0002] In today's power system operation, in order to ensure the safe and stable operation of the power grid, the power system operation department often formulates a series of operating rules for the power system to limit the power system to a certain safe operating space. An important part of these operating rules is the limit transmission capacity of key sections of the power grid. By limiting the transmission power of key sections of the power grid, the effect of ensuring the safe operation of the power grid is achieved. [0003] When the key section is selected, the calculation result of the critical section’s ultimate transmission capacity will be affected by many ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00G06F19/00
Inventor 郭文鑫孙宏斌郭庆来余志文张伯明温柏坚吴文传向德军谭嫣赵峰
Owner POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products