Construction technology for converging compacted concrete dam and riverbed foundation surface
A technology of roller compacted concrete and construction technology, applied in dams and other directions, can solve the problems of troublesome construction, long construction period, and small adaptability, and achieve the effect of improving the safety performance of connection and shortening the construction period.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0011] The technical solution of the present invention is further described below in conjunction with the examples, but the scope of protection is not limited to the description.
[0012] A construction technique for connecting a roller compacted concrete dam to a riverbed foundation surface, comprising the following steps:
[0013] (1) Metamorphic concrete leveling and building foundation surface: After the bedrock surface of the river bed meets the design requirements, metamorphic concrete is used for paving and pouring on the uneven bedrock surface of the river bed, and the foundation surface is leveled to ensure that the abnormal concrete at the thinnest point reaches More than 30cm;
[0014] (2) When the width of the metamorphic concrete leveling foundation surface reaches 2 to 3 zones capable of roller compaction construction, before the metamorphic concrete is not initially set, pour roller compacted concrete on the upper part of the metamorphic concrete surface that ha...