Method and device for deleting component carrier
A component carrier and auxiliary component carrier technology, applied in the field of communication, can solve the problems of battery energy consumption and no practical application value, and achieve the effect of avoiding repeated monitoring
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] figure 2 is a schematic flowchart of a method for deleting a component carrier according to a preferred embodiment 1 of the present invention, as shown in figure 2 As shown, the method includes the following steps:
[0070] Step S202, the base station sends a MAC CE through the primary component carrier configured by the UE to deactivate the component carrier to be deleted;
[0071] Specifically, such as image 3 shown ( image 3 It is a schematic diagram of the component carrier configuration of the UE and the component carrier carrying the MAC CE according to the preferred embodiment 1 of the present invention), the component carriers that the base station can schedule are: 1, 2, 3, 4, 5, and the component carriers to be deleted are 4 , there are three UEs that need to deactivate the component carrier 4 to be deleted, namely UE1, UE2, and UE3. The component carriers configured by UE1 are 1, 2, 3, and 4, of which the primary component carrier is 3, and the seconda...
Embodiment 2
[0080] Figure 4 is a schematic flowchart of a method for deleting a component carrier provided according to the second preferred embodiment of the present invention, as shown in Figure 4 As shown, the method includes the following steps:
[0081] Step S402, the base station sends a MAC CE through the secondary component carrier configured by the UE to deactivate the component carrier to be deleted;
[0082] Specifically, such as Figure 5 shown ( Figure 5 It is a schematic diagram of the component carrier configuration of the UE and the component carrier carrying the MACCE according to the second preferred embodiment of the present invention), the component carriers that the base station can schedule are: 1, 2, 3, 4, 5, and the component carrier to be deleted is 4, There are three UEs that need to deactivate the component carrier 4 to be deleted, namely UE1, UE2, and UE3. The component carriers configured by UE1 are 1, 2, 3, and 4, of which the primary component carrier ...
Embodiment 3
[0092] Figure 6 is a schematic flowchart of a method for deleting component carriers according to the third preferred embodiment of the present invention, as shown in Figure 6 As shown, the method includes the following steps:
[0093] Step S602, the base station sends a MACCE to deactivate the component carriers to be deleted through the primary component carriers configured by some UEs and the secondary component carriers configured by some UEs;
[0094] Specifically, such as Figure 7 shown ( Figure 7 It is a schematic diagram of the component carrier configuration of the UE and the component carrier carrying the MACCE according to the third preferred embodiment of the present invention), the component carriers that the base station can schedule are: 1, 2, 3, 4, 5, and the component carrier to be deleted is 4, There are three UEs that need to deactivate the component carrier 4 to be deleted, namely UE1, UE2, and UE3. The component carriers configured by UE1 are 1, 2, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


