Power grid operating risk recognition and prevention method and system
A power grid operation and risk technology, applied in the direction of instruments, data processing applications, calculations, etc., can solve the problem of non-sharing of information system data and achieve the effect of improving the work level
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] During the construction of the power grid operation risk management and control system, it is necessary to bring together the latest cutting-edge technologies in different professional fields such as power system, computer IT technology, and power informatization, and build a stable and highly reliable application platform relying on the existing basic software and hardware environment. That is, the risk identification and prevention system based on the power grid operation provided by the present invention. see figure 1 , the main ideas of its platform construction include:
[0031] Step 1: Extract model, data and other information from the existing software and hardware platform system with CIM (Common Information Model) / XML (Extensible Markup Language, Extensible Markup Language) standard to build a quasi-real-time operating environment;
[0032] Step 2: Using the electrical topology analysis algorithm, combined with the risk grading standard and the expert rule bas...
Embodiment 2
[0097] Regularly obtain the real-time operation mode and operation measurement data of the power grid from the EMS / SCADA system. The EMS / CIM files storing the power grid equipment, grids, and topology are obtained at daily intervals (belonging to relatively static data), and the measurement data It is acquired in units of 6, 12 or 24 hours (belonging to relative dynamic data), and then after the user selects the fault source equipment, the scope of the fault and the load loss data of the fault after the voltage loss of the faulty element can be analyzed. After the grid grid and expert experience rule library automatically generate the default recovery auxiliary decision-making scheme. The specific steps are as Image 6 shown:
[0098] Step S1: Start.
[0099] Step S2: Extract the real-time operation mode of the power grid, and at the same time, perform intelligent recognition of the model object based on the EMS / CIM standard for the maintenance plan based on the simple text,...
PUM
![No PUM](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com