A training base for a high-speed rail tunnel and its construction method
A tunnel and practical training technology, applied in the field of construction, can solve the problems of the lack of models of high-speed rail tunnels and the inability to obtain the actual structure and related parameters of high-speed rail tunnels through models, so as to improve the learning effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention is described in further detail below in conjunction with accompanying drawing:
[0031] see figure 1 , a training base for a high-speed rail tunnel, which consists of three parts: a tunnel entity, an underground engineering monitoring training room and a tunnel detection training room. Drainage construction section, inverted arch and filling construction section, monitoring and measurement section, initial support construction section, step method excavation section, advanced forecast and construction method operation display section, open hole and exit portal construction section.
[0032] The entrance portal adopts wall-type portal, straight-cut portal, inverted-cut portal, arc-shaped retaining wall-style portal, curved tangent portal, bell-mouth portal, and reverse-cut straight-line gradient portal. Or a variant door; the exit door is extended by an open hole, which is a diagonally cut door.
[0033]The length of the secondary lining construct...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
