A train control system and sand table technology, applied in the direction of instruments, simulators, space navigation equipment, etc., can solve problems affecting the quality of training and teaching in railway colleges, unfavorable students' skills, lack of high-speed train control technology, etc., to achieve locomotive signal The effect of lighting control

Active Publication Date: 2015-04-29
LIUZHOU RAILWAY VOCATIONAL TECHN COLLEGE
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the rapid development of high-speed rail, high-speed rail signal technology is becoming more and more prominent as the core of high-speed rail train control. At present, major railway colleges and universities do not have high-speed rail sand table train control system, which is not conducive to the improvement of students' skills for railway colleges , affecting the quality of practical training in railway colleges and universities
In order to combine students' theory with practice, students need to carry out on-site practice, but because the railway site stipulates that interns can only watch, the effect of practice cannot meet the needs of teaching, therefore, railway colleges must be built to be suitable for the railway site equipment Professional experience and practice drill sites that meet the needs of practical teaching, but most of the current practice drill sites are only suitable for operation and driving related majors, and for signal workers, the parameters of the railway site need to be actually measured, so relevant and applicable train control system for high-speed rail
For the existing high-speed rail sand table train control system, most of them are related vehicle control devices designed by railway enthusiasts, without frequency shift parameters on the railway site, and there is no corresponding high-speed train train control technology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-speed rail sand table train control system
  • High-speed rail sand table train control system
  • High-speed rail sand table train control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0051] A high-speed rail sand table train control system includes a simulated track and a simulated train, and the simulated track includes three track section: track section 6 between A1 and A2, track section 5 between B1 and B2, track section 4 between C1 and C2, and train control devices and ground signal machine;

[0052] The train control devices have the same structure, including a frequency-shifting signal transmitter and a frequency-shifting signal receiver, namely:

[0053] Ground signal machine 41, frequency-shifting signal transmitter 42 and frequency-shifting signal receiver 43 are arranged in track section 4, and frequency-shifting signal transmitter 42 and frequency-shifting signal receiver 43 are installed at the two ends of track section 4 respectively;

[0054] The input end of the frequency-shifting signal receiver 43 is connected with the analog track through a transmission line,

[0055] The output end of the frequency-shifting signal receiver 43 is conn...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Provided is a high-speed rail sand table train control system. The high-speed rail sand table train control system comprises a simulated track and a simulated train. The simulated track comprises two or more track sections, control devices arranged in the track sections and ground signal machines; the control devices have the same structures, each control device comprises a frequency-shift signal transmitter and a frequency-shift signal receiver which are arranged at the two ends of each track section respectively, an input end of the frequency-shift receiver is connected with the simulated track through a transmission line, an output end of the frequency-shift receiver is connected with the frequency-shift signal transmitter of a latter track section through another transmission line, and a controlling end is connected with the ground signal machine in the same track section; the simulated train comprises an inductance coil, a small-signal amplifying circuit, a frequency-shift demodulator, a train signal machine and a train traction system. According to the high-speed rail sand table train control system, the frequency-shift transmitter is adopted to send information to a rail surface, the frequency-shift receiver is used for demodulating the information and controlling the ground signal machines, the simulated train can receive frequency-shift information from the rail surface and control the train signal machine lighting and the running speed of the train, therefore, the real simulation of a railway site is achieved.

Description

technical field [0001] The invention relates to a railway train control technology, in particular to a high-speed train sand table train control system suitable for signal transmission and reception in a high-speed rail sand table, locomotive signal machine lighting and train speed simulation control. Background technique [0002] With the rapid development of high-speed rail, high-speed rail signal technology is becoming more and more prominent as the core of high-speed rail train control. At present, major railway colleges and universities do not have high-speed rail sand table train control system, which is not conducive to the improvement of students' skills for railway colleges , affecting the quality of practical training in railway colleges and universities. In order to combine students' theory with practice, students need to carry out on-site practice, but because the railway site stipulates that interns can only watch, the effect of practice cannot meet the needs of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G09B9/04G09B25/00
CPCG09B9/04G09B25/00
Inventor 黄斌莫振栋陶汉卿唐匀生
Owner LIUZHOU RAILWAY VOCATIONAL TECHN COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products