A production line for screwing sofa pillows
A technology for sofa pillows and screwing, which is applied in the field of machinery, can solve the problems of increasing the labor of the staff, unstable positioning, and easy to be stepped on by the staff, so as to avoid unstable fixing methods, prevent tripping, The effect of reducing labor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Such as figure 1 , figure 2 and image 3As shown, a production line for screwing sofa pillows includes a base 1 on which two positioning tubes 1 2 and 2 3 parallel to each other are fixed, and the positioning tube 1 2 and positioning tube 2 3 are glued outside Or adhesive plaster fixation way is coated with sponge layer respectively, is provided with the trachea that can be connected with air pump in positioning tube-2, and the valve 4 that some are connected with trachea is fixed on the lower part of positioning tube-2, and base 1 is also provided with can The positioning structure 5 placed on the positioning tube 1 2 and the positioning tube 2 3 is positioned by the sofa headrest. The positioning structure 5 includes a positioning plate 51, a positioning plate 2 52, a cylinder 53, a cylinder 2 54, a cylinder 3 55 and a cylinder Four 56, positioning plate one 51 is between positioning tube one 2 and positioning tube two 3, the cylinder body of cylinder one 53 is fix...
Embodiment 2
[0035] Such as Figure 4 As shown, the content in the second embodiment is roughly the same as that in the first embodiment, the difference is that the lifting and positioning structure in the first embodiment is a cylinder, and the lifting and positioning structure in the second embodiment is fixed by a positioning pin Lifting tubes and columns are used to realize lifting and positioning. Specifically, in actual operation, the amount of retraction of column one 12 in lifting tube one 16 can be controlled according to the height required by the operation. Specifically, first column one 12 and column one 12 are adjusted. Lifting tube one 16 relative position on the vertical direction, select suitable connecting hole one and lifting hole one on column one 12 and lifting tube one 16 afterwards, and positioning pin one 17 is penetrated to selected connecting hole one In the lifting hole one, the column one 12 and the lifting tube one 16 are fixed, and at the same time, the positio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


